Sign In | Join Free | My fnxradio.com
China Ningbo Suntech Power Machinery Tools Co.,Ltd. logo
Ningbo Suntech Power Machinery Tools Co.,Ltd.
Ningbo Suntech Power Machinery Tools Co., Ltd. Professional Manufacturer and Exporter of Electric Power Field
Verified Supplier

5 Years

Home > Bare Aluminum Conductor >

132KV Power Transmission Line HDG Lattice Steel Tower

Ningbo Suntech Power Machinery Tools Co.,Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

132KV Power Transmission Line HDG Lattice Steel Tower

  • 1
  • 2

Brand Name : Suntech

Model Number : Lattice Tower

Certification : ISO

Place of Origin : China

MOQ : 1 Tower

Price : Get the latest prices

Payment Terms : L/C, T/T

Supply Ability : 900000 Metric Ton/Metric Tons Per Year

Delivery Time : 30-35 days after deposit

Packaging Details : Exported Containers

Material Type : Steel Q355/Q255

Application : Transmission Line Tower

Surface : Hot Dip Galvanised

Wind Speed : 120 Km/H

Usage : Construction Site

Lifetime : More than 30 years

Contact Now

132KV Transmission Line Lattice Steel Tower Erection Construction Power Site

Transmission lines tower are either monopolar or bipolar systems. With bipolar systems, a conductor arrangement with one conductor on each side of the tower is used. On some schemes, the ground conductor is used as electrode line or ground return. In this case, it had to be installed with insulators equipped with surge arrestors on the pylons in order to prevent electrochemical corrosion of the pylons. For single-pole Suntech transmission with ground return, towers with only one conductor can be used. In many cases, however, the towers are designed for later conversion to a two-pole system. In these cases, often conductors on both sides of the tower are installed for mechanical reasons. Until the second pole is needed, it is either used as electrode line or joined in parallel with the pole in use. In the latter case, the line from the converter station to the earthing (grounding) electrode is built as underground cable, as overhead line on a separate right of way or by using the ground conductors.
Electrode line towers are used in some Suntech schemes to carry the power line from the converter station to the grounding electrode. They are similar to structures used for lines with voltages of 10–100 kV, but normally carry only one or two conductors.

Towers may be self-supporting and capable of resisting all forces due to conductor loads, unbalanced conductors, wind and ice in any direction. Such towers often have approximately square bases and usually four points of contact with the ground.
A semi-flexible tower is designed so that it can use overhead grounding wires to transfer mechanical load to adjacent structures, if a phase conductor breaks and the structure is subject to unbalanced loads. This type is useful at extra-high voltages, where phase conductors are bundled (two or more wires per phase). It is unlikely for all of them to break at once, barring a catastrophic crash or storm.
A guyed mast has a very small footprint and relies on guy wires in tension to support the structure and any unbalanced tension load from the conductors. A guyed tower can be made in a V shape, which saves weight and cost.

ProductSteel Structure Tower
Height5m to 100m or other height customer requirement
Suit forElectric Power Distribution Transmission Steel Tower
ShapeConoid ,Multi-pyramidal,Columniform,polygonal or conical
MaterialUsually Q345B/A572,minimum yield strength>=345n/mm2
Q235B/A36,minimum yield strength>=235n/mm2
As well as Hot rolled coil from Q460, ASTM573 GR65, GR50, SS400, SS490, to ST52
Strength2.5KN,5KN,8KN,10KN,12KN
Torlance of the dimenstion-0.02
Optical assembly of lighting fixtureIP 65
Electroshock resistant protective gradeGrade I
The casing anti-corrosion performanceClass II
Working atmosphere of lighting fixture-40 ºC~+45 ºC
Surface treatmentHot dip galvanized Following ASTM A 123, color polyester power or any other standard by client required
Joint of PolesInsert mode, inner flange mode, face to face joint mode
Design of poleAgainst earthquake of 8 grade
Wind Speed160km/hour
Minimum yield strength335mpa
Minimum ultimate tensile strength400mpa
Max ultimate tensile strength620mpa
StandardISO9001
Length of per sectionWithin 14m once forming without slip joint


132KV Power Transmission Line HDG Lattice Steel Tower











Product Tags:

132KV Lattice Steel Tower

      

HDG Lattice Steel Tower

      

132KV Power Transmission Line Towers

      
Wholesale 132KV Power Transmission Line HDG Lattice Steel Tower from china suppliers

132KV Power Transmission Line HDG Lattice Steel Tower Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Ningbo Suntech Power Machinery Tools Co.,Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)